MSC TERMINAL VALENCIA S.A. - Spain







The objective of the project is to allow the simultaneous berthing of 2 vessels of 366 meters in length, something that was not possible until now due to insufficient berthing lines. The tasks performed were established in the Royal Decree 1627/1997, of October 24, including the previous revision of the Health and Safety plan with the drafting of the corrections report, the favorable report to the Plan, and the follow-up of the work through follow-up visits for the preparation of the on-site report.